BBA signs contract for 2nd Jamuna and Padma bridge feasibility study
Bangladesh Bridge Authority (BBA) has signed a contract with a consultancy firm to conduct a feasibility study for the construction of second bridges over the Jamuna and Padma rivers. Although 12 months have been allocated for the study, Bridge Division Secretary and BBA Executive Director Muhammad